World

Spain officials quit over trains that were made too wide for tunnels

February 21, 2023
Spain’s Secretary of State for Transport Isabel Pardo de Vera is among the top bosses to quit. — courtesy Europa Press News
Spain’s Secretary of State for Transport Isabel Pardo de Vera is among the top bosses to quit. — courtesy Europa Press News

MADRID — Two top Spanish transport officials have resigned over a botched order for new commuter trains that cost nearly €260 million ($275 million; £230 million).

The trains could not fit into non-standard tunnels in the northern regions of Asturias and Cantabria.

The head of Spain’s rail operator Renfe, Isaías Táboas, and the Secretary of State for Transport, Isabel Pardo de Vera, have now left their roles. The design fault was made public earlier this month.

The Spanish government said the mistake was spotted early enough to avoid financial loss. However the region of Cantabria has demanded compensation.

Renfe ordered the trains in 2020 but the following year manufacturer CAF realized that the dimensions it had been given for the trains were inaccurate and stopped construction.

The rail network in northern Spain was built in the 19th Century and has tunnels under the mountainous landscape that do not match standard modern tunnel dimensions.

The mistake means the trains will be delivered in 2026, two years late.

Renfe and infrastructure operator Adif have launched a joint investigation to find out how the error could have happened. Earlier this month, Spain’s Transport Ministry fired a Renfe manager and Adif’s head of track technology over the blunder.


February 21, 2023
510 views
HIGHLIGHTS
World
4 hours ago

Trump arrives in Qatar after meeting Syrian president in Riyadh

World
4 hours ago

Israeli strikes in northern Gaza kill at least 48, hospital says

World
4 hours ago

South Africa's President Ramaphosa says Afrikaners resettling in US are 'cowards'